Learn more about our concrete pouring process, local costs, and winter care guidelines.

In Calgary, a standard broom-finish concrete driveway ranges from $9 to $14 per square foot. Exposed aggregate and decorative stamped concrete driveways typically cost between $14 and $22 per square foot. The price depends on excavation requirements, thickness (4" vs 5"), sub-base condition, and access difficulty.

We take four steps to minimize cracking: (1) Excavate clay and compact 4-6 inches of gravel (3/4" road crush) subgrade. (2) Pour a 32 MPa concrete mix featuring 5% to 8% air-entrainment bubbles to absorb freeze-thaw water expansion. (3) Tie a 10mm steel rebar grid spaced at 16" on center rather than weak wire mesh. (4) Cut control joints at proper depths and intervals to guide inevitable shrinkage.

You can walk on newly poured concrete after 24 to 48 hours. However, you should wait at least 7 full days before parking regular passenger vehicles on it, and 28 days for heavy commercial trucks or equipment to prevent structural damage.

Yes. We offer several stamped concrete patterns including Ashlar slate, running-bond cobblestone, brick borders, and realistic wood plank texture. We use integral coloring mixed directly in the concrete truck so the pigment runs throughout the entire slab, complemented by secondary highlight antiquing agents.

Yes. Calgary Concrete Masters holds a current City of Calgary Business License, is WCB Alberta compliant, and maintains COR safety certification for residential and commercial worksites.

We serve all communities within Calgary as well as surrounding areas including Airdrie, Cochrane, Okotoks, Chestermere, and Strathmore. Contact us to confirm service availability in your specific area.

Yes. All of our concrete installations come with a comprehensive written workmanship warranty. We are confident in our engineering approach — deep gravel bases, structural steel reinforcement, and premium air-entrained concrete mixes — and we back that with a commitment in writing.

A typical residential concrete driveway takes 2-3 days from start to finish: Day 1 for excavation and gravel base compaction, Day 2 for formwork, rebar installation, and the concrete pour, and Day 3 (if needed) for finishing and initial sealing. You can expect full use of the driveway approximately 7 days after the pour.

We can pour concrete in temperatures as low as -5°C with proper cold-weather precautions including heated water in the mix, accelerated curing admixtures, and insulated blankets over the slab. However, we generally recommend scheduling pours between May and October for best results and avoid pouring when ground frost is present.

Simply fill out our contact form or call us at +1 (647) 581-1411. One of our estimators will schedule a free on-site visit to measure your project and deliver a detailed written quote within 24 hours — with zero pressure and no hidden fees.

Still Have Questions?

Our team is happy to answer any specific questions about your concrete project.

Get a Free Estimate